WOW. Itās been over a year since I last wrote about our remodel. Weāve continued, but at a much slower pace. The next step was to have the carpet and hand rail ripped out and new hardwood stairs put in and two new custom handrail. We also continued with the new color and trip in our former loft area. āThe Loftā used to be our āofficeā space⦠not anymore.
The beginning process was the PURGE⦠Iām a ācollectorā not a hoarder⦠but sometimes I am so embarrassed by my own insanity. I only got a few pictures during the purge phaseā¦
YES those are 3.5ā floppies! ā¹ I havenāt used a floppy disk in I donāt know how long⦠this is only one bin full⦠there was more than one. (oh, Iām so blushing right now!)
Then there were the magazines (this is a 60 gallon roll cart!)
If you recall at the end of Phase 2 in January 2011 (Remodel, Part 25: New Office), this is what the entry way looked like.
This is a crappy picture, but this is the loft before they startedā¦
First step⦠removing carpet and putting in new skirting (wood on side of stairs)ā¦

Then time to start putting in new hardwood floorā¦
Come back tomorrow for more. š